Skip to content
Construction project at dusk

/ Cost Estimating · P6 Scheduling · Forensic Review

BEFORE THE FIRST BOLT,
THE PROJECT IS
WON OR LOST.

OBDNC, based in Puerto Rico, delivers expert cost estimating and scheduling for construction, infrastructure, and energy. No guesswork. No generalist tools. Every estimate built on 26+ years of field-verified benchmarks and reviewed by a senior estimator. Bilingual team — English and Spanish. US mainland, Puerto Rico and Latin America.

$2.4B+
Projects analyzed
847+
Estimates delivered
26+
Years field-verified data
10+
Years Primavera P6

The estimate is not a spreadsheet.
It is the first structural decision of every project.

A boutique estimation practice. From a homeowner's addition to a federal capital program — the same rigor, the same standard. Any company, any individual, any scale.

Every estimate is prepared and reviewed by a senior estimator — working from the owner's documents, applying discipline-specific takeoff, and producing defensible cost positions that hold up line by line.

The result: estimates that are traceable, auditable, and ready for owner presentation — delivered in a fraction of the time.

5 MARKETS.
FIELD-VERIFIED
COSTS.

Our cost intelligence is calibrated to the specific standards, benchmarks, and delivery requirements of each market — not generic estimation logic applied to everything.

01
Tier 1 — Immediate

PUERTO RICO
INFRASTRUCTURE

Federal · FEMA · CDBG
FEMA-Funded ProgramsGrid · Water · Public Works
Federal Flood ControlCivil Works · Resilience
Power GenerationGas Conversion · Upgrades
CDBG-MIT HurricaneResilience · Ongoing
02
Tier 1 — Growth

OIL & GAS /
ENERGY

Upstream · Midstream · LNG
LNG FacilitiesCEPCI-Escalated Equipment
Deepwater PipelineCost-per-Mile Analysis
DecommissioningGoM · Trinidad · Americas
Upstream CAPEXISBL/OSBL · Hand Factors
03
Tier 1 — Expansion

AI & DATA
CENTERS

Hyperscale · Colocation · Edge
Hyperscale / ColocationTX · VA · OH — Priority
MEP-First EstimationCritical Power · Cooling
GC SubcontractorFast-Turn · PE-Validated
Commissioning CostTesting · Start-up
04
Tier 2 — Existing

COMMERCIAL &
HOSPITALITY

Active · Act 60 PR
Multi-Family ResidentialPuerto Rico · Reference
Hotel DevelopmentPuerto Rico Market
Tribal GamingCasino Expansion · California
Tax Incentive ProjectsAct 60 · Investor-Driven
Act 60 InvestorsPR DevelopersHotel Owners
05
Tier 2 — Recurring

FORENSIC & CLAIMS

Quoted per engagement
Litigation SupportConstruction Disputes · CLE
Insurance ClaimsDefect · Delay
Surety / Bond ClaimsCost-to-Complete Analysis
Change Order AuditPE-Sealed · Audit Trail
Construction Law FirmsInsurersSurety CompaniesOwner's Reps

SIX SERVICE LINES.
ONE STANDARD.

01 / 06
COMMERCIAL CONSTRUCTION

Mid-rise residential, mixed-use, institutional. Full CSI MasterFormat coverage. Owner bid form reconciliation included.

02 / 06
AI DATA CENTERS

Hyperscale and colocation facilities. MEP-heavy estimation, critical power, cooling infrastructure.

03 / 06
OIL & GAS

Upstream, midstream, LNG. CEPCI-escalated equipment costs, ISBL/OSBL breakdown, decommissioning scopes. IOC and EPC ready.

04 / 06
FORENSIC & AUDIT

Change order validation, claim analysis, dispute support. Defensible methodology with full audit trail and PE-sealed deliverables in Puerto Rico.

05 / 06
PUBLIC INFRASTRUCTURE

Utilities, roads, bridges, federal and FEMA-funded programs. Puerto Rico and US mainland. Compliant with federal cost principles.

06 / 06
PLANNING & SCHEDULING

Primavera P6 baseline schedules — WBS, logic, durations, constraints. Monthly updates, time impact analysis, MS Project to P6 conversions, cost-loaded schedules.

HOW WE
WORK

01
Document Review & Classification

Owner bid forms, drawings, addendums, and specifications are reviewed and classified by document type — not treated as uniform input. Authority documents establish the estimate baseline before any quantity is taken off.

02
Discipline-Specific Extraction

Quantities are taken off per CSI division, each within a defined scope — preventing the cross-discipline duplication that inflates estimates.

03
Quantity Validation & Review

Every quantity is checked against field benchmarks, reviewed for inconsistencies, and scope gaps are flagged — before any cost is applied.

04
Defensible Cost Deliverable

Final output: traceable, owner-ready cost analysis with full line-item backup. Optionally PE-sealed through our engineering alliance for projects in Puerto Rico. Ready for bid submission or litigation support.

FROM FIELD DATA
TO COST TRUTH

Twenty-six years of sealed bids, change orders, and as-built quantities — applied by an estimator who prices, not guesses.

01 — BENCHMARK LIBRARY

Field-verified, not theoretical.

Every unit rate traces to a real project — installed, paid, and reconciled. No published averages. No vendor list pricing. The baseline is what the work actually cost.

DATASET
26+

Years of reconciled cost data behind every estimate.

SCHEDULING
P6

Cost and schedule built together — Primavera P6 baselines and updates.

02 — PARAMETRIC SYNTHESIS

Patterns become predictions.

The estimator maps incoming scope against historical analogs, isolating cost drivers per CSI division. Quantities are generated within disciplined bounds — never extrapolated past the data that supports them.

03 — INTERROGATION

Every number defends itself.

Extracted quantities are challenged against benchmarks, cross-checked for duplication, and flagged where scope is silent — before a single dollar is applied.

04 — TRACEABLE OUTPUT

Owner-ready. Litigation-ready.

The deliverable carries full line-item backup and a clear path from source document to final cost. Defensible under audit, permit review, or dispute.

Reference Project

MULTI-FAMILY RESIDENTIAL

Puerto Rico · Active Project

CSI
Full-division takeoff
structured to the bid form
Gaps
Scope gaps flagged
before bid submission
Backup
Line-item backup
for owner and lender review

Other references: high-rise mixed-use tower (Southern California) · casino expansion (California) · healthcare facility (Puerto Rico) · 15+ additional projects in Puerto Rico.

Vertical 01

COMMERCIAL CONSTRUCTION

From residential towers to institutional campuses, OBDNC applies RSMeans-calibrated benchmarks against discipline-extracted quantities — producing estimates that speak the owner's language at bid time.

Conceptual EstimatingBid Form ReconciliationGMP ValidationValue EngineeringChange Order Review
Vertical 02

AI & DATA CENTERS

Hyperscale and edge facilities demand MEP-first estimation logic. Our estimates are calibrated for power density, cooling infrastructure, and the redundancy standards that separate tier classification from expectation.

MEP Cost AnalysisCritical Power SystemsCommissioning CostGC Subcontract Ready
Vertical 03

OIL & GAS

Upstream, midstream, and downstream capital cost intelligence. CEPCI-escalated equipment sizing, Hand factors for ISBL/OSBL, and LNG benchmarks aligned to IOC/EPC procurement standards.

Upstream CAPEXLNG FeasibilityDecommissioning CostPipeline Estimate as a Service
Vertical 04

PLANNING & SCHEDULING

Cost and time are the same decision. We build Primavera P6 schedules with real logic — WBS, durations, constraints — and keep them current through construction, so the estimate and the schedule tell the same story.

P6 Baseline SchedulesMonthly Updates & ReportingTime Impact AnalysisMS Project to P6Cost-Loaded Schedules

Carlos R. Villalobos
Founder & Principal

26+ years in construction cost estimating and forensic cost audits, Puerto Rico and California.

10+ years in Primavera P6 scheduling.

B.S. Civil Engineering, Polytechnic University of Puerto Rico. PMP. Tools: Primavera P6, MS Project, Bluebeam.

Bilingual — English and Spanish. US mainland, Puerto Rico and Latin America.

PE-SEALABLE
BY DESIGN

Layer 01

Quantity Verification

Each takeoff is reconciled against discipline benchmarks and prior as-builts. Discrepancies surface before cost is applied — not after delivery.

Field-benchmarked
Layer 02

Multi-Discipline Review

Civil, structural, mechanical, and electrical scopes are validated by licensed professional engineers — closing the gaps that single-discipline estimates miss.

PE Licensed · Multi-discipline
Layer 03

Sealed Deliverable

For projects in Puerto Rico, the final analysis can carry a licensed PE seal through our engineering alliance — giving the document legal standing for permits, lending, and litigation support.

Projects & Solutions PSC · PR

FREQUENTLY
ASKED

How is your fee set?

A fixed fee, quoted per engagement before we start. Our fee never depends on the outcome of the review.

Is my project information kept confidential?

Yes. Every engagement is covered by a confidentiality agreement, client data is never shared without permission, and any sample we show is anonymized.

Can you work for one side of a dispute if you know the other party?

We run a conflict check on every case and never work both sides of the same project.

Can the deliverable carry a PE seal?

For projects in Puerto Rico, yes, through our engineering alliance with Projects and Solutions PSC, when the assignment requires it.

Where do you work, and in which language?

Puerto Rico, the U.S. Virgin Islands and the mainland U.S. Reports in English or Spanish.

TALK TO AN
ESTIMATOR

A renovation or a capital program — tell us the project. We respond with scope, fit, and next steps, not a sales call.

Prefer email? c.villaloboss@obdnc.io · Book a 20-min call (projects of $1M or more)

Phone: (939) 489-7682 · WhatsApp

Professional Analysis

READY TO
ESTIMATE AT SCALE?

Requests and inquiries: c.villaloboss@obdnc.io